Project Implemented

September, 2017

LLC “Tolyatti Methanol” (TOMET), methanol production shop.
CJSC «A-INTEGRA » specialists have completed the works on equipping two compressors with an anti-surge and control system at the methanol production shop.
Project implementation included design documentation development, engineering works, equipment supply, installation supervision and commissioning activities, surge tests.
All installation and commissioning works on the anti-surge and control system were completed in time, within the unit overhaul period.